e*Board Method of Construct
페이지 정보
작성자 관리자 작성일07-08-17 16:50 조회5,078회 댓글0건본문
Pre-Application
1. Form Installation ① After form installation, clean up and remove nails on the surface. ② Indicate e*Board applying point on the form surface.
2. Adhere e*Board
① Arrange e*Board on the applying point, and adhere each board closely.
② Fix up e*Board with exclusive usage nail(non-head nail) of 40mm along the edge of board.
③ Be careful not to harm the surface of e*Board caused by succeeding construction progress such as iron arrangement and concrete stuffing.
3. Remove form
① Dismantle the form carefully not to be damaged e*Board surface.
댓글목록
등록된 댓글이 없습니다.